at this stage, and I fully appreciate the great initial difficulties he has had to face. Work during the rains is necessarily slow, the earth being saturated with moisture and the Tunnel very wet while labourers suffer from sickness. I trust that more rapid progress will now be made, but the Consulting Engineers will no doubt take into serious consideration the position of affairs disclosed in this Despatch. Mr. Ives under date of 19th instant expresses his belief that the Tunnel will be open for traffic by the middle of May, 1910.

14.

Since writing the foregoing paragraphs I have received a report (for which I had called) from Mr. Waite, Superintendent of the Tunnel Work, copy attached. As a result of this report the Chief Resident Engineer is now asking for 1 Walking Ganger, 2 Bricklayers, and 2 "Dog-Slashers", which seems to justify Mr. Logan's contention that more staff was required. I have also received a letter from Mr. Logan tendering his resignation. I greatly regret this for Mr. Ives admits that he has a "high opinion of him as a worker, and change of District Engineers upon whom devolves (in the circumstances I have described) the main supervision of the actual construction work is likely to cause fresh delay and possibly change of method.

enclosure 6.

Edit History

2026-06-05 12:57:41 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
690 at this stage, and I fully appreciate the great initial difficulties he has had to face. Work during the rains is necessarily slow, the earth being saturated with moisture and the Tunnel very wet while labourers suffer from sickness. I trust that more rapid progress will now be made, but the Consulting Engineers will no doubt take into serious consideration the position of affairs disclosed in this Despatch. Mr. Ives under date of 19th instant expresses his belief that the Tunnel will be open for traffic by the middle of May, 1910. 14. Since writing the foregoing paragraphs I have received a report (for which I had called) from Mr. Waite, Superintendent of the Tunnel Work, copy attached. As a result of this report the Chief Resident Engineer is now asking for 1 Walking Ganger, 2 Bricklayers, and 2 "Dog-Slashers", which seems to justify Mr. Logan's contention that more staff was required. I have also received a letter from Mr. Logan tendering his resignation. I greatly regret this for Mr. Ives admits that he has a "high opinion of him as a worker, and change of District Engineers upon whom devolves (in the circumstances I have described) the main supervision of the actual construction work is likely to cause fresh delay and possibly change of method. enclosure 6.
Baseline (Original)
21. 690 at this stage, and I fully appreciate the great initial difficulties he has had to face. Work during the rains is necessarily slow, the earth being saturated with moisture and the Tunnel very wet while labourers suffer from sick- -ness. I trust that more rapid progress will now be made, but the Consulting Engineers will no doubt take into serious consideration the position of affairs disclosed in this Despatch. Hr. Ives under date of 19th. instant expresses his belief that the Tunnel will be open for traffic by the middle of May, 1910. 14. Since writing the foregoing para- -graphs I have received a report (for which I had called) from Mr. Waite, Superintendent of the Tunnel Tork, copy attached. As a result of this report the Chief Resident Engineer is now asking for 1 Walking Ganger, 2 Bricklayers, and 2 "Dog-Slashers", which seems to justify Mr. Logan's contention that more staff was required. I have also re- -ceived a letter from Mr. Logan tendering his resignation. I greatly regret this for Mr. Eves admits that he has a " high opinion of him as a worker, and change of District "A Engineers upon whom devolves (in the circumstances I have described) the main supervision of the actual construction work is likely to cause fresh delay and possibly change of method onolosure 6.
2026-06-05 12:57:41 · Baseline
View content

21.

690

at this stage, and I fully appreciate the great initial

difficulties he has had to face. Work during the rains is

necessarily slow, the earth being saturated with moisture

and the Tunnel very wet while labourers suffer from sick-

-ness. I trust that more rapid progress will now be made,

but the Consulting Engineers will no doubt take into

serious consideration the position of affairs disclosed

in this Despatch. Hr. Ives under date of 19th. instant

expresses his belief that the Tunnel will be open for

traffic by the middle of May, 1910.

14.

Since writing the foregoing para-

-graphs I have received a report (for which I had called)

from Mr. Waite, Superintendent of the Tunnel Tork, copy

attached. As a result of this report the Chief Resident

Engineer is now asking for 1 Walking Ganger, 2 Bricklayers,

and 2 "Dog-Slashers", which seems to justify Mr. Logan's

contention that more staff was required. I have also re-

-ceived a letter from Mr. Logan tendering his resignation.

I greatly regret this for Mr. Eves admits that he has a

"

high opinion of him as a worker, and change of District

"A

Engineers upon whom devolves (in the circumstances I have

described) the main supervision of the actual construction

work is likely to cause fresh delay and possibly change of

method

onolosure 6.